Monday, May 18, 2009

Our basement mess

How lovely for us when we discovered that we have another leak in our basement. We found the mess on April 24th. (we have since found the pipe, and have fixed it) But our movie room is still such a big mess, still no one has come to fix it. Hopefully in a week or so. I miss watching movies down there.

The wall was all soft and mushy. Mark poked a hole in the wall with NO effort.
The little stage got wet too, but not the whole thing.

Because we have radient heating, we have to have a special padding on the floor, and unfortunately it soaks up the water like crazy, so half of the padding was ruined. But thankfully the carpet wasn't.
The paint peeled off very easily. It was bubbling with water inside it!
Mark cut the walls and took out all the insulation. This is what needs to be fixed now. It isn't very big, but it is such a hassle!
The hole in the ceiling.
The whole mess.

post signature


0 comments: